Product info
MiaCara presents a contemporary twist on a timeless classic with the new Lucca collection of modern rope dog collars and leads.
This ever-popular and much-copied style originated in Italy in the 80’s. Now re-imagined by the design team at MiaCara, the Lucca collection uses only the finest materials to ensure the ultimate in style and durability.
The Lucca rope collar and lead are handcrafted from heathered braided waxed cotton, natural, un-split, full-grain cowhide leather and satin plated full-brass hook – all made in Italy.
Each collar and lead comes in a signature MiaCara drawstring bag.
Design: MiaCara Design Team